MLB wrap: Dodgers re-take first in NL West; Cubs, Astros prolong leads | MLB

0
48



The race to win the National League West goes to come back right down to the wire and the chief of the division has modified once again.

The Dodgers took down the Cardinals Saturday 17-Four behind three home runs from Yasiel Puig whereas the Rockies lost to the Giants 3-Zero which supplies Los Angeles a 1/2-game lead within the division race.

The Diamondbacks are additionally nonetheless within the race for the West, however they bought knocked round by the Astros 10-Four to fall 4 games again of the Dodgers for the high spot and three half games again of the Rockies for second within the division.

Houston now leads the American League West by Three half games because the A’s fell to the Rays 7-5 on the energy of Jake Bauers’ three-run home run off of commerce deadline acquisition Jeurys Familia.

In the National League Central, the Cubs fought off the Reds for a 1-Zero victory which helped them open up a 2 1/2-game lead over the Brewers, who fell to Pittsburgh 3-1.

Studs of the Night

Jose Ramirez went Three for Four with a double, triple, stroll and two RBIs in Cleveland’s 15-Zero win over the Tigers. The Indians clinched the American League Central with the win.

Blue Jays outfielder Randal Grichuk went Three for five with two home runs and two RBIs in an 8-7 win over the Yankees. New York remains 1 half games forward of the A’s for the first wild-card spot.

Dud of the Night

Mets outfielder Jay Bruce went Zero for Four with three strikeouts in New York’s 5-Three loss to the Red Sox.

Highlight

Mariners outfielder Mitch Haniger took away a double from Angels outfielder Justin Upton.

Seattle is 7 half games again for the A’s for the second wild-card spot.

What’s Next

Nationals (75-74) at Braves (83-65) 1:35 p.m. ET —  The race for the National League East just isn’t over. While Atlanta has a 6 1/2-game lead on the Phillies for first within the division, something can occur with 14 games left. The Nationals could even come again to win it although that’s extremely unlikely. Washington will ship Tanner Roark (8-15, 4.37) to the mound with the Braves will give the ball to Sean Newcomb (12-8, 3.82).





Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here

fourteen + eighteen =